English
Español
Português
русский
Français
日本語
Deutsch
tiếng Việt
Italiano
Nederlands
ภาษาไทย
Polski
한국어
Svenska
magyar
Malay
বাংলা ভাষার
Dansk
Suomi
हिन्दी
Pilipino
Türkçe
Gaeilge
العربية
Indonesia
Norsk
تمل
český
ελληνικά
український
Javanese
فارسی
தமிழ்
తెలుగు
नेपाली
Burmese
български
ລາວ
Latine
Қазақша
Euskal
Azərbaycan
Slovenský jazyk
Македонски
Lietuvos
Eesti Keel
Română
Slovenski
मराठी
Srpski језик 2024-09-29
As domestic enterprises are setting up branch factories in Vietnam, Thailand, Mexico and other countries, Shuai Rui Automation is committed to meeting the needs of foreign markets and demonstrating the strength of Chinese manufacturing with its sophisticated automation equipment.
1. Preparation before shipment
(1). Equipment testing: Conduct comprehensive functional tests and quality inspections on automation equipment to ensure that the equipment operates normally and is free of defects.
(2). Cleaning equipment: Clean dust, oil and other impurities on the surface of the equipment.
(3). Prepare packaging materials: Prepare appropriate wooden boxes, tin foil, bubble film and other packaging materials and tools according to the size and weight of the equipment.
2. Packing and shipping
(1). Fixing equipment: Place the equipment steadily at the bottom of the packaging box, separate the equipment from the box wall with cushioning materials, and use fixings to fix the equipment when necessary.
(2). Packing: Use customized wooden boxes for packing according to equipment specifications to ensure reasonable use of internal space.
(3). Sealing: Use a nail gun to seal the packaging box to ensure that the box will not be accidentally opened during transportation.
(4). Label printing: Print clear labels on the packaging boxes.
(5). Weight and size measurement: Ensure that the packaged equipment meets Thailand's import standards and transportation requirements.
(6). Forklift handling: Use a forklift to safely move the packaged equipment to the shipping area and prepare for loading.
(7). Loading: A professional team will operate to ensure that the equipment is firmly placed on the truck to avoid movement or damage during transportation.
(8). Shipping: Choose a reputable international logistics company to ensure that the equipment can be delivered to Thailand safely and on time.